Published in United States

Senator Ernst moves to cancel Biden's BEAD program

Dec 06, 2024 | Posted by Abdul-Rahman Oladimeji

Senator Joni Ernst has told the US Department for Government Efficiency (DOGE) to shut down the $42 billion Broadband Equity, Access, and Deployment (BEAD) program. DOGE was formed by Trump as part of his campaign plans to significantly slash federal spending and is not actually a federal executive department as it would require an act of Congress to create. 

BEAD, which was set up by the Biden Administration, was created by Congress in November 2021 and has been implemented by the National Telecommunications and Information Administration (NTIA). The federal grant program is funding programs to build Internet infrastructure in unserved locations across the US and its territories.

"President Biden’s so-called infrastructure program provided $7.5 billion to build a nationwide network of electric vehicle (EV) charging stations and $42 billion to expand broadband. Three years later, just 17 EV stations are completed and not a single person—not one—has been connected to the Internet yet. It’s time to pull the plug," said Ernst in the letter.

There are 4701 data centers in United States.

Sitemap for Peterson Companies' Leesburg Gateway Project
Posted in Peterson: Leesburg Gateway Campus Source: Peterson Companies
Posted in Stonebridge: Fort Meade Campus |
Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8

Ready to Level up Your
Data Center Strategy?