Data4 Luxembourg SARL

Latest Podcast
8 Rue Henri M. Schnadt
Operational
Fully operational facility
Operated by:

Data4 Luxembourg SARL

This was a former Secure IT site that was acquired in 2012.

Map and Nearby Locations:

8 Rue Henri M. Schnadt
DATA4 Group Sites
Nearby Facilities

Sites within 15 miles of Data4 Luxembourg SARL

Distance Site About
0.26 miles ebrc Resilience Centre Luxembourg City
0.27 miles Portus LUX1
0.28 miles Portus: Luxembourg
This facility was previously operated by European Data Hub, which rebranded to Portus Data Centers in November 2024.
2.73 miles Tango Bertrange
3.07 miles Telkea 1 Rue de Bitbourg
4.43 miles BCE Colocation Luxembourg
4.65 miles Verizon Luxembourg
4.90 miles Visual Online Contern
5.32 miles LuxConnect Bettembourg Campus
5.32 miles Datacenter Luxembourg SA
5.32 miles Data4 Luxembourg
6.43 miles EBRC Resilience Centre Luxembourg South
8.45 miles EBRC Resilience Centre Luxembourg West
12.22 miles EBRC European Reliance Centre East
14.46 miles LuxConnect Bissen DC2

Data4 Luxembourg SARL Data Center Photos (See all)

DATA4 Group's Facility on 8 Rue Henri M. Schnadt
Source: Baxtel

Operating Company

Operated by:

Created in 2006 by Colony Capital, DATA4 is the European specialist in the construction and operation of ultra-secure data centers for French and international companies in the digital, manufacturing, service and banking and insurance sectors, who are seeking to outsource their data.

DATA4 manages flexible, high-performance and carrier- and cloud-neutral data centers, offering solutions from one colocation rack all the way through to purpose-built, dedicated facilities.

DATA4 Group operates data centers in France, Italy and Luxembourg, with a total net technical area of 22,000m² of IT rooms and more than 32 MW of IT power.

Company History:


2006: Creation of DATA4, joint venture between Alcatel, French telecommunications giant, and Colony Capital, international investment fund.

2007: The first client is hosted on the Paris campus

2009: The third building comes on line

2010: The fourth building comes on line

2011: The fifth building comes on line

2012: The sixth building comes on line and incorporates a high-density room.

2012: Acquisition of 3 data centers in Luxembourg, from Secure IT

2013: Creation of the Milan campus

2014: The first client from Milan is hosted

2015: A new executive committee is appointed to support the Group's growth targets.

2015: Second and third buildings in Milan comes on line

65
Facilities
3
Markets
375MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?