E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026
Eric Bell
World
DataHall is developing a data center in Halle/Saale, Saxony-Anhalt, approximately 30 miles northwest of Leipzig. Construction is slated to begin in 2026, with operations expected to commence around 2027/2028. The facility will initially deploy 4MW of redox flow batteries, with plans to expand to 50MW.
| Distance | Site | About |
|---|---|---|
| 16.25 miles | Greenmake: Weida-Land, Germany |
A major renewable energy and AI data center campus is planned for Weida-Land in Germany, located in the Saxony-Anhalt municipality.
|
| 16.36 miles | nLighten Leipzig LEJ1 | |
| 18.23 miles | AM:PM Grund: Leipzig Campus |
AM:PM Grund is planning to develop a massive data center campus on a 44-hectare site at the Zschortau industrial park in Rackwitz, just outside Leipzig.
|
| 18.46 miles | AM:PM Grund: Leipzig Expansion |
DataHall develops innovative concepts for efficient and highly integrated data centers and data ecosystems. The company assembles an interdisciplinary team of experts from various relevant industries to create tailored solutions.
DataHall commits to three core principles: 100% local renewable energy, maximum energy conservation, and 100% EU data sovereignty.
Its data centers are powered exclusively by regional renewable energy sources, utilizing environmentally friendly battery storage instead of diesel generators to optimize the use of photovoltaic and wind power plants.
Through an innovative ecosystem approach, the waste heat generated by the data centers is harnessed to create effective energy cycles and support the local heat transition.
Data protection and data sovereignty are top priorities for DataHall. Adhering to Gaia-X guidelines, ethical and moral data handling is ensured.
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas