Street Address
Interested in this information? Contact us
OperationalPlanned
Operational with future phases planned
Operated by:

DMG Blockchain: Christina Lake, BC

Year Built: 2019
Lot Size: 33 acres
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

DMG Blockchain Solutions’ Christina Lake data center near Grand Forks, British Columbia, is a power-optimized digital infrastructure facility built on a 33-acre site with a ~27,000 sq ft core building. Originally developed for Bitcoin mining, the site is being positioned as a flexible compute facility capable of supporting both blockchain and high-performance workloads. Leveraging access to low-cost hydroelectric power and a scalable rural footprint, the data center is designed to accommodate modular deployments and evolving compute use cases, including AI and GPU-based workloads.

Map and Nearby Locations:

This Facility
DMG Blockchain Solutions Sites
Nearby Facilities

Ridge Three Data Center Photos (See all)

Operating Company

Operated by:

DMG is a vertically integrated blockchain and cryptocurrency company that manages, operates, and develops end-to-end digital solutions to monetize the blockchain ecosystem

1
Facilities
0
Markets
2MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?