Under Construction
New facility under construction
Operated by:

Google: North Weald Airfield

Year Planned: 2027
Lot Size: 52 acres

Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.

Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase. Epping Forest District Council announced the sale of part of North Weald Airfield in Essex in late January 2024 to create a data centre campus.

  • The North Weald site is the second package of land Google has acquired in the county. In November 2023 it was revealed that the company had bought a 129-acre plot in Purfleet, which was formerly the Arena Essex Raceway, a stock car and speedway racing track.

Map and Nearby Locations:

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of Station Prime

Distance Site About
3.66 miles Kao Data: KLON-08
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
3.66 miles Kao Data: KLON-07
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
3.66 miles ServerChoice: Harlow
3.67 miles Kao Data: Harlow KLON-01
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
3.72 miles Kao Data: KLON-03
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
3.73 miles Kao Data: KLON-02
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
3.79 miles Kao Data: KLON-04
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
5.86 miles Nscale: Loughton, Essex
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
7.49 miles Exa: Hoddesdon
9.05 miles Hyperscale Data Center Request Dataset
As part of a £5 billion two-year commitment to the UK, Google has opened a new data centre in Waltham Cross, Hertfordshire.
9.14 miles Green Mountain: London East
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
9.22 miles Green Mountain: London East Bldg 2
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
9.23 miles Infinity Romford North and South
10.29 miles VIRTUS London1 Enfield
10.29 miles Wavenet: Enfield
Wavenet’s Enfield facility is not a stand-alone data centre – it is “Data Hall 4” inside the Virtus LONDON1 campus.
11.01 miles Ark: Meridian Park
11.13 miles Coreix Enfield
11.90 miles NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
13.56 miles Digital Reef: East Havering Campus
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
14.25 miles Infinity SDC HereEast
14.91 miles Stratus: Belvedere
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
15.36 miles Netwise London East (NLE)
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
15.51 miles Kao Data: Bidder Street, Newham
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
15.62 miles IP House: London
15.68 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
15.68 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
15.69 miles OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
15.94 miles Verizon London THW
15.95 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
15.98 miles CapitaLand: Welwyn Garden City
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
15.99 miles GTT London GS2
16.00 miles Global Switch: London East
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
16.02 miles Global Switch: London North
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
16.03 miles Lumen London 3 (E India Dock)
16.05 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
16.09 miles ADA: LCY02
This building is the second facility in Ada Infrastructure's Docklands campus, East London.
16.11 miles ADA: LCY03
This building is the third facility in Ada Infrastructure's Docklands campus, East London.
16.16 miles ChunkyChips: Essex DC1
16.17 miles ADA: East London Docklands
The project's first phase includes a 64,245-square-meter (691,530 sq ft) data center building (LCY01) with a substation.
16.23 miles Equinix: Hertfordshire Campus (DC01UK)
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
16.24 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
16.29 miles Equinix: Hertfordshire Expansion
16.31 miles ServerChoice: London
16.43 miles Hyperscale Data Center Request Dataset
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
16.53 miles Six Degrees: Anchorage Point
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
16.70 miles nLighten: London Citi
In April 2024, nLighten acquired the site from Exa Infrastructure.
16.71 miles European Liquidity Center (EULC)
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
16.79 miles Digital Meridian Gate (215 Marsh)
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
16.84 miles Digital Sovereign House (227 Marsh Wall)
16.87 miles Internap London
16.90 miles Digital Realty: LON2
16.93 miles Colt House London
16.95 miles TeliaSonera HEX/A
16.97 miles Six Degrees: London (Interxion LON3)
16.99 miles Digital Realty: LON1 LON3
17.00 miles Wavenet: Harbour Exchange
17.00 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
17.01 miles Coreix Docklands
17.02 miles Epsilon London Telephone House
17.03 miles AIMES DC3 Mastmaker Road
17.08 miles Stellanor: London City
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
17.11 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
17.11 miles Caineal: Wickford
The Caineal Wickford Data Center is a £1.3 billion high-performance artificial intelligence facility located on a 1.8-hectare site in Wickford, Essex, spearheaded by the London-based developer Caineal LLP.
17.13 miles Fujitsu: London East (SDC01)
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
17.13 miles iomart DC2 London
17.14 miles Telehouse London Metro
17.16 miles DRT London (Bonnington House)
17.18 miles Digital Docklands: Cloud House
17.25 miles Lumen: Goswell Rd
17.25 miles Stellanor: London North
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
17.27 miles Echelon LCY10
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
17.28 miles AtlasEdge: London LCY001
17.29 miles Fibroptic: City Reach, Docklands
Since its opening in 2011, this Tier 2 data centre has provided secure, high-performance colocation at City Reach, Isle of Dogs.
17.29 miles LeaseWeb: London LON-12
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
17.29 miles City Reach London Docklands
17.29 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
17.29 miles Centersquare: Docklands LHR2
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
17.31 miles DDCL: London
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
17.32 miles Stellanor: London East
It was originally a Lumen (formerly Level 3) data center.
17.52 miles Verne: London DC01
The site originally opened in 2013 as Volta Data Centres (specifically Volta GSS) and was rebranded to Verne Global in 2022 following its acquisition by Digital 9 Infrastructure.
17.55 miles Verne: London EC1
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
17.62 miles Computacenter: Hertfordshire
17.80 miles Verizon London UK5
18.06 miles Lumen: 10 Fleet Pl
18.22 miles Netwise London Central
Netwise has officially closed its "London Central" data center facility, which was a key part of their operations in London; the closure happened in June 2024,
18.72 miles aptum London
18.86 miles Custodian Dartford DA2
19.13 miles NTT: London LON2
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
19.13 miles Carrier-Neutral Data Center Request Dataset
19.34 miles Intercity: Elstree
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
19.43 miles Zenium London One
19.47 miles ServerChoice: Stevenage
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
19.71 miles iomart: DC12 North London
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
19.83 miles Nigsun: Stevenage NCS1
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
19.95 miles Pure DC: Brent Cross
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.

East Hub Data Center Photos (See all)

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.