Operational
Fully operational facility
Operated by:

Hut 8: Winnipeg

Ownership: Hut 8 Corp does not own the building.
░░░ Request Dataset MW
Total Power

Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.

  • Up to 300 kW total available power, on redundant 1.2 MW grids
  • 300 kW diesel and generator back-up
  • Clean power supplied by redundant UPS, each having redundant battery banks
  • A/B power available

Map and Nearby Locations:

This Facility
Hut 8 Corp Sites
Nearby Facilities

Sites within 15 miles of Alpha

Distance Site About
0.00 miles Exchange Group - Global Server Center
0.33 miles Les.net YWG2
0.50 miles Manitoba Hydro Telecom Data Centre
5.25 miles Equinix Winnipeg WI1
The site was formerly known as "Q9 Winnipeg" which was acquired by Equinix from Bell Canada in 2020.
13.16 miles Jet.AI: Winnipeg Campus
Jet.AI Inc. is pivoting from aviation software into the digital infrastructure space through a partnership with Consensus Core Technologies. The firms are developing a 350-acre data center campus 10 miles south of Winnipeg, Manitoba.

Pro Data Center Photos (See all)

Operating Company

Operated by:

Hut 8 is one of North America's oldest, largest and most innovative digital asset miners in the world. Hut has one of the highest installed capacity rates in the industry and is the largest holder of self-mined Bitcoin of publicly traded companies globally.

19
Facilities
1
Markets
1193MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?