Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

Iren: Horizon 1

Year Built: 2025
░░░░ Request Dataset MW
Total Power

IREN's liquid-cooled data center at Childress is a high-performance facility specifically engineered to host demanding AI and High-Performance Computing (HPC) workloads. This center is future-proofed by design, capable of supporting the next-generation NVIDIA Blackwell GPUs and is characterized by an ultra-high rack density of 200 kW, which requires advanced liquid-cooling technology.

The facility expands IREN's capacity to serve the escalating demand for infrastructure needed for training large, complex AI models.

Map and Nearby Locations:

This Facility
IREN Sites
Nearby Facilities

Sites within 15 miles of Valley Max

Distance Site About
0.32 miles Crypto Mining Data Center Request Dataset
The site is directly connected to the ERCOT electricity grid via a 345kV transmission connection located on the 420-acres of freehold land owned by IREN.
2.29 miles Lancium: Childress Expansion
3.43 miles Lancium: Childress Campus
Lancium plans to build up to 10 data center facilities in Childress, with a planned investment of $4 billion per site.

North Point Data Center Photos (See all)

Operating Company

Operated by:
7
Facilities
0
Markets
960MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?