PACE: Lone Star Project

Latest Podcast
Glasscock County
Land BankPlanned
Future facility in planning with land secured
Operated by:

PACE: Lone Star Project

Year Planned: 2028

Pace is developing the Lone Star Project in Glasscock County, focusing on a "speed to power" strategy to support intensive AI workloads. The campus utilizes behind-the-meter natural gas to generate electricity on-site, allowing the project to begin operations independently of the primary power grid.

This self-sufficient energy model is supported by secured land, water rights for cooling, and redundant fiber connectivity. While the site is designed for massive long-term scalability, the developer intends to eventually integrate with ERCOT to supplement its on-site generation and further expand its infrastructure footprint within the Texas market.

Map and Nearby Locations:

Glasscock County
PACE AI Infrastructure Sites
Nearby Facilities

Sites within 15 miles of PACE: Lone Star Project

Distance Site About
0.00 miles Crypto Mining Data Center Request Dataset
0.47 miles Crypto Mining Data Center Request Dataset
8.50 miles Crypto Mining Data Center Request Dataset
The Bitcoin mining data center in Garden City, Texas is located adjacent to a wind farm and uses predominantly renewable energy. It was constructed and energized in 2023 and supports a workforce of approximately 25 employees.

PACE: Lone Star Project Data Center Photos (See all)

Operating Company

Operated by:

Pace is a data center firm based in Austin, Texas, and founded by Preston Stein and Chance Pressley. PACE is focused on AI and high-performance compute projects where site control, power strategy, commercial structuring, and execution discipline all matter from day one.

1
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?