Project Laurel

Latest Podcast
Sanatoga Rd
Planned
Future facility in planning stage
Operated by: MCD 7 LLC

Project Laurel

Site planned for 2028 and has expansions through 2035
Lot Size: 192 acres

MCD 7 LLC’s Project Laurel is a high-density, AI-ready data center campus designed to leverage the specialized infrastructure of Limerick Township. Strategically positioned on a 192-acre site near a major nuclear power source to ensure reliable and scalable energy, the project features a total of 8 massive buildings.

Reaching heights of 85 feet, these multi-story facilities are engineered for intensive AI and high-performance computing, aiming to transform the local landscape into a major digital infrastructure hub while providing significant tax revenue to the surrounding community.

Map and Nearby Locations:

Sanatoga Rd
MCD 7 LLC Sites
Nearby Facilities

Sites within 15 miles of Project Laurel

Distance Site About
1.54 miles Constellation Energy: East Coventry
The proposed Constellation Energy Data Center in East Coventry Township is a massive planned campus intended to span five parcels (approximately 100 acres).
2.83 miles Pennhurst Expansion
2.83 miles Pennhurst Data Center
Spanning approximately 125 acres, the submitted preliminary plan outlines five two-story data center buildings, totaling over 1.3 million square feet, alongside a dedicated five-acre electrical substation.
7.85 miles Flexential Philadelphia - Collegeville
7.85 miles GSK Phoenixville
11.43 miles Colocation America - Philadelphia DC2
11.43 miles TierPoint Valley Forge
The site is a former XAND data center before being acquired by TierPoint in 2014
11.69 miles Lumen Norristown
13.18 miles 1547: Chester County, PA
16.04 miles Comcast National Data Center: East Goshen
16.25 miles DāStor: 3400 Horizon
The facility is network neutral with multiple carriers in place and a redundant fiber ring that connects to 401 North Broad Street in Philadelphia
17.04 miles DāStor: 411 Swedeland
This site is designed to support Life Science and Technology Companies.
18.93 miles Windstream Conshohocken

Project Laurel Data Center Photos (See all)

Proposed sitemap for Project Laurel in Limerick Township
Source: Limerick Township | MCD 7 LLC

Operating Company

Operated by: MCD 7 LLC
1
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?