A large data center is set for Teesside, UK, after receiving outline planning permission from the Redcar and Cleveland Council. The approval comes despite objections from BP, which claims the project will obstruct its plans for a nearby hydrogen plant.

The proposed 500,000-square-meter campus is a project by Teesworks Ltd, the public-private partnership transforming a 4,500-acre former steelworks site into Europe’s largest brownfield regeneration project. Tech giant Google is reportedly in talks to occupy the development, which is planned to include six two-story data halls. While this initial permit is a major milestone, a detailed "reserved matters" application is still required before construction begins.

BP’s competing interest for the site involves H2 Teesside, a blue hydrogen plant. This technology produces fuel from natural gas while capturing carbon emissions, classifying it as a low-carbon energy source.

Map and Nearby Locations:

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of Center Prime

Distance Site About
0.79 miles Hyperscale Data Center Request Dataset
2.08 miles Wilton DC2
This Building is a part of Wilton Data Centre Campus. DC building (DC Building 2) would have a building footprint of 47,250 sqm (508,600 sq ft).
2.10 miles Wilton Data Center Campus
Wilton Data Centre is building a data center complex on a 32-acre plot at the Wilton International Park outside Middlesbrough in North Yorkshire.
5.18 miles Level3 Middlesbrough
7.29 miles DXC: Wynyard Park Billingham
The DXC Wynyard Data Center, often called the "Northern Data Center," is a massive 360,000 sq. ft. facility in Stockton-on-Tees that stands as a landmark of sustainable engineering.
9.04 miles Latos: Stockton DC02
The development, situated on a 1.85-acre vacant site within the Preston Farm Industrial Estate, will comprise two buildings (DC 01 and 02) totaling 1,725 sqm (18,595 sq ft).
9.08 miles Latos: Stockton DC01
UK data center firm Latos is planning a new "Neura Data Centre" campus in Stockton-on-Tees, just outside Middlesbrough.
18.52 miles Carrier-Neutral Data Center Request Dataset
Deep Green is building a data center in Darlington, UK.

Hub Alpha Data Center Photos (See all)

Rendering of the planned Teesworks AI Data Center
Source: Lichfields

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

217
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?