US Signal Grand Rapids South

Latest Podcast
400 76th St. SW Byron Center
Operational
Fully operational facility
Operated by:

US Signal Grand Rapids South

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Located next to US-131 in Grand Rapids South, Michigan

Power

  • (2) - 800a 480V 3 phase
  • (2) 500kW diesel generators with 24 run time at full load
  • 675kVa UPS with battery backup
  • DC power with battery backup available
  • Power capacity and power quality monitored by US Signal TOC

Cooling

  • 240 tons of cooling, via Liebert DX and DS units
  • Cold aisle containment throughout the space
  • Temperature and humidity monitored by US Signal TOC

Fire Suppression

  • FM200 and Ecaro 25 dry fire suppression throughout the building
  • Photoelectric fire sensors throughout the space

Security

  • RFID access readers on all doors
  • Digital video surveillance monitored live in US Signal TOC, recordings kept for at least 90 days
  • Steel mesh in all walls for added security

Map and Nearby Locations:

400 76th St. SW Byron Center
US Signal Sites
Nearby Facilities

Sites within 15 miles of US Signal Grand Rapids South

Distance Site About
0.01 miles 123NET: DC4
0.05 miles ManagedWay Byron Center
5.19 miles Hyperscale Data Center Request Dataset
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
5.63 miles Switch: Grand Rapids 3
This facility is part of Switch's Pyramid Campus in Grand Rapids.
5.67 miles Hyperscale Data Center Request Dataset
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
5.81 miles Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
6.00 miles Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
6.01 miles Hyperscale Data Center Request Dataset
Microsoft has filed a rezoning request for a 40.5-acre portion of its 316-acre holding in Gaines Township.
6.11 miles Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
6.53 miles US Signal: MI01 Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
15.33 miles Hyperscale Data Center Request Dataset
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.

US Signal Grand Rapids South Data Center Photos (See all)

Operating Company

Operated by:

US Singal Data Centers are:

  • Audited for compliance with HIPAA/HITECH, PCI DSS, and SOC 1, TYPE 2
  • Scalable and customizable
  • Powered by US Signal's wholly owned, robust network

US Signal rings the Midwest with its fiber-optic network. The network connects subscribers in the metropolitan areas of Indianapolis, Detroit, Chicago, and 12 other cities. US Signal provides telecommunications services to institutional, enterprise, and wholesale customers in Illinois, Indiana, Michigan, and Wisconsin. It also provides Internet access, dark fiber capacity, and colocation services. The company's related infrastructure services include network design and construction. US Signal has supply partnerships with equipment manufacturers including ADTRAN and Cisco Systems. Source: hoovers.com

21
Facilities
11
Markets
33MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?