ChillMine Partners with AAAS Energy for Solar Powered Facility in Palpye, Botswana
September 29, 2025
Munich-München
| Distance | Site | About |
|---|---|---|
| 0.34 miles | EdgeConnex Munich |
Edgeconnex acquired the facility from Vodafone in January of 2019.
|
| 0.98 miles | euNetworks Munich 2 | |
| 1.03 miles | euNetworks Munich 1 | |
| 1.43 miles | Equinix Munich MU1, MU3 |
|
| 1.43 miles | Level3 Munich (Seidlstraße) | |
| 3.58 miles | Max Planck Society: Munich |
The Max Planck Society in Germany is building a new data center in Munich after getting approval for a modified plan.
|
| 3.64 miles | NorthC: Munich |
In 2021, the NorthC Group acquired the IP Exchange data centers in Munich and Nuremberg.
|
| 5.05 miles | nLighten: Munich |
In February 2023, nLighten acquired the site from Exa Infrastructure.
|
| 5.05 miles | T-Systems München | |
| 6.26 miles | NorthC: Munich II |
The NorthC Munich II facility, located in Wamslerstrasse, officially joined the NorthC portfolio in September 2025.
|
| 7.21 miles | Equinix Munich MU4 | |
| 9.87 miles | noris Munich MUC5 | |
| 10.25 miles | NTT Munich 1 |
|
| 10.49 miles | DCP: Munich |
The site will offer 6,300 square meters (67,810 square feet) of white space across three floors, aiming for a Power Usage Effectiveness (PUE) of 1.2.
|
| 11.08 miles | NTT Munich 2 |
|
| 11.27 miles | Portus: Munich |
The company acquired this newly developed data center in Munich, which had been developed by SpaceNet AG, a local IT services provider.
|
| 11.30 miles | Portus: MUC2 |
European operator Portus Data Centers has announced the expansion of its Munich colocation campus with a new facility, Portus Data Centers Munich 2 (MUC2).
|
September 29, 2025
Munich-München
July 15, 2024
Vodafone
July 03, 2024
Vodafone
May 30, 2024
Vodafone
May 29, 2024
Vodafone
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas