Withdrawn
Project cancelled before construction
Operated by:

Google: Indianapolis (Project Flo)

Lot Size: 468 acres

Google has withdrawn its proposal to build a 468-acre data center in Franklin Township, Indiana. The company, through its affiliate Deep Meadow Ventures LLC, was seeking to rezone 468 acres of land from agricultural and residential to a commercial special district. This decision came after significant local opposition and the high probability that the Indianapolis City-County Council would deny the rezoning request.

Map and Nearby Locations:

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of Center Max

Distance Site About
4.32 miles DC Blox: Thunderbird Commerce Center, Indianapolis, Indiana
DC Blox is developing a three-building data center campus at 305 Fintail Drive within the Thunderbird Commerce Center in east Indianapolis, Indiana.
4.54 miles Lifeline Eastgate
7.92 miles Metrobloks: Indianapolis A1
The IND-A1 data center is a $500 million development project located in Indianapolis’ Martindale-Brightwood neighborhood.
7.93 miles Metrobloks: Indianapolis IND-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in East Indianapolis, with live capacity scheduled for Q1 2027.
8.22 miles Lumen Indianapolis 1
8.63 miles AT&T CO 5009 E 38th
AT&T central office. Not clear if the company offers colocation at this location
9.38 miles Online Tech
9.47 miles US Signal Indianapolis IN01
Located in the heart of Indianapolis, Indiana, this location has recently been expanded to allow more customers to house their infrastructure and transmit their data entirely on the US Signal network
9.56 miles Netrality 701 W Henry
Netrality Data Centers has opened a new data hall in Indianapolis, Indiana, offering 1MW of capacity across 3,800 sq ft (353 sqm).
9.58 miles Databank Indianapolis IND2
9.60 miles Databank Indianapolis IND1
The site was formerly known owned by Lightbound before being acquired in October 2019.
9.61 miles Raeden: Indianapolis, IN
The facility is strategically positioned at the largest nexus of fiber and interconnection within the Indianapolis Tech Center on Henry Street.
9.63 miles Netrality Indy Telecom Center
The Indy Telecom Center is a 11 building 9-acre campus comprising ~205k sqft. The campus is considered Indianapolis's Carrier Hotel.
11.82 miles Surge: Hancock County MegaSite
Due to local opposition, Surge Development has withdrawn its proposal to rezone land in Indiana for a new data center.
16.34 miles American Tower: Indianapolis, IN
American Tower affiliate ATC Watertown LLC plans to develop a 20,000-square-foot edge data center at 7701 Walnut Drive in North Indianapolis.
16.38 miles US Signal: IN02 Indianapolis
16.46 miles Sabey: Decatur Tech Park
The Sabey Data Centers project in Decatur Township, known as the Decatur Technology Park, represents a $4 billion investment designed to support high-density computing and artificial intelligence workloads.
16.71 miles Sabey: Decatur Bldg-B
This facility is part of Sabey Data Centers project in Decatur Township, known as the Decatur Technology Park.
18.36 miles Lumen Indianapolis 3
18.54 miles Expedient Indianapolis
Redundant electric utility power feeds, 4 auto-cutover diesel generators, multiple cooling systems, a 24-inch raised floor, and advanced fire suppression
19.09 miles RadiusDC: Plainfield 2
This facility is part of RadiusDC's Plainfield Campus in Indianapolis.
19.27 miles RadiusDC: Plainfield Campus
RadiusDC intends to develop two 100,835-square-foot facilities on a 31-acre site in the Indianapolis metro area.
19.75 miles Prologis: Shelbyville, Indiana
Industrial real estate giant Prologis is proposing a massive data center campus in Shelbyville, Indiana, spanning approximately 576 acres.

Central Hub Data Center Photos (See all)

Plans for the google data center campus between South Post Road and David Road in Franklin Township
Project Flo campus mockup
Source: Metropolitan Development Commission

Plans for the google data center campus between South Post Road and David Road in Franklin Township

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

217
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?