Columbus Data Center Acquired by Occupier
April 30, 2026
Ohio
This 62,000-square-foot data center has 20,000 square feet of raised flooring, 20,000 square feet of office space and an 18,000-square-foot mechanical/electrical plant. It features two 2,000-kilowatt generators, four 500-kilovolt static uninterruptible power supply (UPS) modules in two separate systems, and two 350-ton air-cooled chillers. This facility was designed for expansion into an 80-watts/square-foot data center upon full fit out and is designed to withstand 150 mile-per-hour wind. The center is Safe Harbor and SSAE 16 certified.
| Distance | Site | About |
|---|---|---|
| 0.16 miles | 5CDC: Columbus CMH01 |
5C Data Centers, a Canadian operator, acquired a live data center and plans to develop it into a campus named CMH01.
|
| 12.32 miles | Thor Equities: Urbana, Ohio |
Thor Equities is venturing into the western Ohio market with a proposed $1 billion data center campus known as the Urbana Technology Hub.
|
April 30, 2026
Ohio
March 19, 2026
Ohio
March 12, 2026
Ohio
February 17, 2026
Ohio
January 08, 2026
Ohio
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas